Note: This Kaizen activity was done in 3 days with only 4 people. It was a grueling 3 days however the progress that was made really inspired me. The hardwork and dedication of this team was incredible.
WHY IT WAS DONE
- To document entire process
- To capture what the document controllers were/are responsible for
To create work instructions to help ease new document controller into position
To create an area for data booking - To reduce current backlog and ensure current data books are to the customer on time
WHAT WAS DONE
- Process mapped entire process, including active data (expediting final certified documents, expediting documents for approval, transmittals, document returns and data booking)
- Created comprehensive work instructions for the processes mentioned above, as well as those which pertain to the processes
- Trained in standard work
- Created a knowledge/training matrix for main processes
- Created a specific area to allow for POU conditions (new layout)/5S area
- Created kanban system for the ordering of supplies (min/max stock levels)
- Created a pull system for the copying of data booksCreated library for engineer books
- Setting goals at the beginning of kaizen helps to accomplish them
- Kaizen brings out problems that were hidden/only known by those that are directly affected by them.
- Process maps shows the differences of how 1 controller differs from anotherStandardization/work instructions are important for training as well as for quality
- Comprehensive work instructions
- Team building
- New layout in engineering to accommodate “copy centre” and library
- Kanban cards created/stock levels determined
- Eliminated 2 processes (cutting down active data time by 25%)Reduced data booking time/active data time by introducing mandatory A01 for every order.
- Folders in ‘copy centre’ for all outside documentation
- Kanban cards for reorder point for all supplies
- Pull system for ‘copy centre’ queue – by team colour
- Issue board/chart for outstanding materials required by document control (to be viewed during weekly Gemba walk)
- “Work instructions provide an in-depth look at ‘document controllers’ jobs”
- “There will always be some resistance to change – feel good that Kaizen is the right thing to do”
- “In only 3 days, we knocked down ~25% cycle time and created a new space for us to do our work in – what a team effort!”